Warning: include_once(/home/geghna/ethiopianism.net/wp-content/mu-plugins/cl-smart-advice.php): Failed to open stream: No such file or directory in /home/geghna/ethiopianism.net/wp-settings.php on line 442

Warning: include_once(): Failed opening '/home/geghna/ethiopianism.net/wp-content/mu-plugins/cl-smart-advice.php' for inclusion (include_path='.:/opt/alt/php82/usr/share/pear:/opt/alt/php82/usr/share/php:/usr/share/pear:/usr/share/php') in /home/geghna/ethiopianism.net/wp-settings.php on line 442

Deprecated: Creation of dynamic property YourChannel_Updater::$name_key is deprecated in /home/geghna/ethiopianism.net/wp-content/plugins/yourchannel/YourChannel.php on line 848

Deprecated: Creation of dynamic property YourChannel_Updater::$version is deprecated in /home/geghna/ethiopianism.net/wp-content/plugins/yourchannel/YourChannel.php on line 851

Deprecated: Creation of dynamic property YourChannel_Updater::$name is deprecated in /home/geghna/ethiopianism.net/wp-content/plugins/yourchannel/YourChannel.php on line 853
The Ethiopian Megalomaniac Death Dam Gibe II start operating risking millions riparian population & the environment… – Ethiopianism

Warning: Attempt to read property "ID" on null in /home/geghna/ethiopianism.net/wp-includes/media.php on line 2997

Notice: Function map_meta_cap was called incorrectly. When checking for the read_post capability, you must always check it against a specific post. Please see Debugging in WordPress for more information. (This message was added in version 6.1.0.) in /home/geghna/ethiopianism.net/wp-includes/functions.php on line 6078


Gilgel Gibe II, Ethiopia’s pyramidal hydroelectric power plant built on the epicenter of moving East African and Nubian Plaque has dangerously started service after suspended operation for 11 months ago. The collapse of the tunnel was mainly caused by the movement of  separating East African Rift Valley stretching from Afar Triangle down to the Omo , thus  river creating a new ocean breaking the Horn of Africa from the rest of the continent into an island.

Gibe II dam fatally stopped operation immediately after it started service on these moving plates earlier this year due to the collapse of 26 km long tunnel.

This dangerous project initially cost Italian company Salini 375 million euros. The reconstruction of these destructive Dam cost almost half of the initial cost of construction.

Ethipian dictator’s  other destructive Dams are those of Tana Beles at the source of the River Nile and Tekeze. Both dams’ will mostly be used for irrigation on the grabbed fertile lands, thus diminishing the amount of water that will flow down to Sudan and Egypt. With the increase of land grabbing in the country for intensive commercial farms, the river basin will also weaken and eventually dry the Nile and the Tekeze rivers. The traditional Ethiopian farmers who have been evicted from their ancestral farms by the land grabbers never used water intensive farms and crops  for over a three  millennium. In the contrarily these new commercial crops are not environment friendly rather will affect the only remaining meager forestry in the south if any left in the country.  Commercial farms in general are water intensive when it comes producing in quantity. When it comes to  non renewable  fossil   energy an  industrial farms will need more than ever  for the ever demanding  cash crops production and most of the land could be used  such production and rural urban immigration will definitively grow   by the evicted  farmers whose land have been grabbed moving to the  cities.
The increase Eastern African  tectonic plate  movement  created a Geological  split in the tunnels, however,  the ruling  dictator gave order  to reconstruct the deadly  tunnel  after being briefed  that   it had caused a major slit in the concrete lining 9kms deep in the over 25kms long tunnel on  22 January, almost a week after inauguration. But shamefully the Ethiopian genocidal strong man ordered the reopening of the risky plant   which was closed 25 January, 2010.

GII uses water from another deadly dam constructed more than 26kms away for an existing power plant called GI. After it generates 180Mw at the older station, the water is channeled through 25.8kms long, 6.3m diameter concrete tunnel bowered through chains of volcanic mountains to generate 420Mw at GII.

The recent Earth Quake which menaced the region with a force 5.1 riche Terre has affected the three dams in the region further risking the inhabitants. The arrogant obstinate   Ethiopian dictator has provoked the extinction of the original cradle of humanity the Omotic population from the face of the earth. Over 1 and half million inhabitant down river will starve by end of the damming project by the drastic change of their traditional way of life depending on the cyclic flooding of the Omo River.

These fragile tunnels are supported by a steep elevation, two 1,000m long metal penstocks at GII pouring  water from the tunnel in the mid-height of a tectonic mountain down to the turbines at the bottom, gushing power station menacing to explode even with a minimum earth Quake caused by ever opening moving rift valley which the dams helplessly trying to connect together. With water pressure and the moving plates could bust at any time in the rainy season like last winter over flooding the dams killed unknown number of people and live stock displacing over 100 thousands.

Ethiopia was forced to fall in a power crisis caused by the ruling regime led to a regular power shedding in order to justify its construction of megalomaniac dams in a country where the already existing dams have not been used to their maximum potential. The existing dams would have been reinforced   before constructing further at the expense of the environment and extension of Omotic people. The dictator schedule for almost a decade now the country to embark on the construction of more than five ambitious power plants strictly to be used for export orientated commercial grabbed lands at the expense of the local farmers and power exportation for the neighboring countries, as Zneawie  dreams  to become a water power. Such projects will risk the down river inhabitants of Lake Turkana in Kenya, Sudan and Egypt.

The genocidal corrupted dictator ordered to shed power intensively over the past three years, thus artificially to prospect the resolution of the crisis by commissioning destructive plants, like GII.   The hastily   constructed dams proved the contrary by collapsing.

The so called Ethiopia’s landscape and its river basins are said to have given the country a potential to generate over 46,000Mw hydropower but its current electricity generation capacity is 2,000MW, more than double from 2006 is a myth. Since the country situated in live volcanic region of the world with a high risk of eruption and unprecedented earth quake will the  lives of Millions in the region.  The magalomaniac dictator Melese must be stopped before further damaging the region leading to water crisis as seen from his recent declartion of war against Egypt.

Ethiopia must embark to more alternative nature friendly energy powers like, gas, wind, solar and thermal energy than deadly dams to the destruction of the flora and fauna of the country. Moreover, such non consented projects will menace the neighboring countries like Egypt and Sudan leading to eventual war and conflict.

Prof. Muse  Tegegne

Related Posts

Ethiopian dam to ‘wreck lives in Kenya’ – Richard Leakey

Giant Ethiopian dam to make 200000 go hungry: NGO | Reuters

Study Shows Malaria Infections Increase Near Ethiopian Dam

ETHIOPIADam Critics Won’t Go Away

Omo River dam threatens traditional farming and culture in 

Why Residents Want Ethiopian Dam on River Omo Stopped Urgent 

The Great Ethiopian Rift Valley – Koka Plains ..

Egyptians discuss response to Ethiopian dam | Al-Masry Al-Youm 

Ethiopia prepares case for mega-hydropower project funding

Ethiopia seals China deals to boost power



.






By Prof. Muse Tegegne

Prof. Muse Tegegne has lectured sociology Change & Liberation in Europe, Africa, Asia, and Americas. He has obtained Doctorat es Science from the University of Geneva. A PhD in Developmental Studies & ND in Natural Therapies. He wrote on the problematic of the Horn of Africa extensively. And Lecture at Mobile University..

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.